The traditional way of setting traffic cone manually by road maintenance personnel will be changed. Learned from the municipal maintenance company yesterday, "road traffic road cone installation device" recently passed the expert review and acceptance, and is expected to promote the application in the whole industry.
The device is mainly composed of three parts: main support, storage tank and release control switch. Before maintenance operation, the operator shall place the traffic cone storage in the storage tank. When the vehicle is in front of the maintenance project, it only needs to start the control switch to realize the automatic release of traffic cone. The shortest automatic landing time for each traffic cone is only 1.4 seconds.
After watching the live demonstration of the equipment, the relevant experts said that the device structure is simple, easy to operate, the future promotion of the use will reduce the maintenance of the closure personnel of the operation risk, greatly improve the work efficiency.
Hot products
Mobile: +86 15097722953
Email:metalproducts2021@163.com
Email:1755383270@qq.com